Friday, February 27, 2009

Bad Mojo?

I'm definitely in a knitting funk right now. Everything I've been working on has had some kind of disaster. The Summer Braids needs a lot of work (after wearing it around the house, I decided that I don't like how wide the sleeves are. I'll be ripping them back and doing my decreases more often). The BPT/CPH is a disappointment due to reversing almost all of the cables. I'm going forward with it, as while it's not as clever as the original design, it's still going to be a nice cardigan. Now here's the latest disaster:


My Gaelic Morning Mist... is going to be a complete frog. The body is complete, and so I blocked it while I worked on the sleeves.

It's too small. I am using a tighter gauge (but by one stitch per inch), so I went up a size to compensate. Still too small. So I'm debating if I want to go up another size or use a larger needles. I've decided that I really like the density and drape of my current gauge, so I'll just go up an other size. So it's going to be a complete frog and restart. Yum!

So I'm now worried about working on Iain for Matt... I want no disasters with that!

1 comment:

  1. I've got it too (bad knitting mojo.) I finished a sweater and it's too small. I ripped out 3/4 of a pair of socks (the downside to doing both at once) and am still not sure I like them. Right now all I'm really working on is a Clapotis. By #4 it's pretty mindless.

    I've been catching up on my reading instead. :-)

    ReplyDelete

Sorry about having to add the word verification for comments, but even with moderation, my inbox was being over run with spam. So thanks for taking the time to leave a comment!

Blogger does not give me your email address when you leave a comment, so I can not respond back to you. Keep an eye on my blog and I will try to respond there.