click to enlarge
Staghorn is progressing steadily, but not at quite the same pace. Basically I didn't spend the last two days knitting 8 hours straight (each day), so I didn't get the front done. However, it is past the halfway point, and I still think the knitting will be done by the end of the weekend.
It's still a fabulous knit and I'm enjoying it. However, it's cooled down enough that we've turned off the A/C. Just warm enough that wool in my lap isn't thrilling. I can knit with it off to the side, but it's harder to do that for any extended lenght of time (say, like 8 hours straight). We'll see how the weather is for when I go to seam it. It has to be in my lap for that.
October Frost is next up out of the book A Fine Fleece, and I have some lovely raspberry colored Green Mountain Spinnery Mountain Mohair all ready for it. Any casting on for it is purely for swatching purposes only. Really.
swatch away!
ReplyDelete